Service
http://www.ycf.com.cn
     

 

  Scope of Work :
  Interior Eng.
1、Ceiling System
a-1.(Heavy Duty ,Ceiling system )
a-2.( PU Panel Ceiling system )
a-3. (T-Bar Ceiling system)
b-1. ( HEPA Units )
b-2.( Filter Fan Units )
b-3.( Black Panel )
c. ( Accessories )
2、Wall System
a. ( Wall Panel )
b. ( Doors )
c. ( Windows )
d. ( Air shower & pass box )
3、Floor System
a. P.V.C ( Static Conductible )
b. ( Epoxy Coating )
c. (Access Floor System )
  HVAC & FILTRATION System.
1、Chilling water station
a. ( Chilling water system )
b. ( Cooling tower system )
c. ( Vibration , Balance and Installation )
d. ( Piping & Insulation work )
2、Make-up & Re-cir. Air System
a. ( Filters )
b. ( Vibration , Balance and Installation )
c. ( Duct work )
d. ( Piping & Insulation work )
3、Exhaust Air System
a. (General Exhaust Air System )
b. (Acid Exhaust Air System )
c. (Heat Exhaust Air System )
d. (Organic Exhaust Air System )
  Electrical & Control Eng.
1、Electrical Eng.
a. (Substation Equipment Eng)
b. Panel (Overload protection devices)
c. Boxes ( Lighting switch & Receptacle )
d. ( Conduit )
e. ( Wire and cable )
f. (application for electric, water&telecom)
g. ( Motor control )
h. ( Lighting )
i. ( Grounding )
j. ( Fire alarm system )
k. ( Network system )
l. ( Gas detection system )
2、Control System ( Temperature , Humidity and Pressurization )

 

 
(e) 2003-20xx Ycf Engineering Ltd .All rights reserved.